Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

451

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Frozen fruit, juice, and vegetable manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TR0044 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $363 $1,726
SF0591 #11 Y:2022 Install equipment (eg compactor) to reduce disposal costs $35,700 $132,000
SF0591 #10 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $47,418 $177,700
SF0591 #09 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $5,521 $18,051
SF0591 #08 Y:2022 Insulate feedwater tank $1,806 $4,445
SF0591 #07 Y:2022 Utilize higher efficiency lamps and/or ballasts $11,540 $14,724
SF0591 #06 Y:2022 Install set-back timers $22,648 $6,467
SF0591 #05 Y:2022 Utilize energy-efficient belts and other improved mechanisms $814 $268
SF0591 #04 Y:2022 Remove or close off unneeded compressed air lines $6,698 -
SF0591 #03 Y:2022 Reduce excess steam bleeding $9,616 -
SF0591 #02 Y:2022 Make a practice of turning off lights when not needed $9,922 -
SF0591 #01 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $1,537 -
OR0757 #04 Y:2022 Add equipment/ operators to reduce production bottleneck $194,400 $300,000
OR0757 #03 Y:2022 Install automatic packing equipment $97,200 $50,000
OR0757 #02 Y:2022 Optimize production lot sizes and inventories $26,900 -
OR0757 #01 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $1,612 -
MZ0313 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $1,950 $500
MZ0313 #02 Y:2021 Use most efficient type of electric motors $34,967 $33,446
MZ0313 #01 Y:2021 Eliminate or reduce compressed air usage $2,725 $240
BS0146 #06 Y:2021 Use or replace with energy efficient substitutes $686 $972