ITAC Assessment: SF0591
ITAC logo
ITAC Assessment: SF0591
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Peaches, Strawberries
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 850,000
ft2
Annual Production 67,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,155,539 29,682,000
kWh
Electricity Demand $615,372 60,966
kW-mo/yr
Electricity Fees $91,059 -
Natural Gas $264,706 32,519
MMBtu
TOTAL YEARLY COSTS $3,126,676
RECOMMENDED SAVINGS* $153,220 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,945

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,537 - $2,617
35,033
kWh
- - $(-1,080.0) -
02 2.7124: Make a practice of turning off lights when not needed $9,922 - $8,017
107,320
kWh
$1,905
-
kW-mo/yr
- - -
03 2.2162: Reduce excess steam bleeding $9,616 - - - $9,616
-
MMBtu
- -
04 2.4235: Remove or close off unneeded compressed air lines $6,698 - $6,698
89,681
kWh
- - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $814 $268 $684
9,158
kWh
$130
-
kW-mo/yr
- - -
06 2.6232: Install set-back timers $22,648 $6,467 $5,236
70,108
kWh
- $17,412
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $11,540 $14,724 $8,954
119,878
kWh
$2,415
-
kW-mo/yr
- $313 $(-142.0)
08 2.2123: Insulate feedwater tank $1,806 $4,445 - - $1,806
-
MMBtu
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,521 $18,051 $5,521
73,912
kWh
- - - -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $47,418 $177,700 $47,418
634,886
kWh
- - - -
11 3.6193: Install equipment (eg compactor) to reduce disposal costs $35,700 $132,000 - - - - $35,700
TOTAL RECOMMENDED $153,220 $353,655 $85,145
1,139,976
kWh
$4,450
-
kW-mo/yr
$28,834
-
MMBtu
$(-767.0) $35,558
TOTAL IMPLEMENTED $65,945 $39,242 $34,426
460,899
kWh
$4,320
-
kW-mo/yr
$27,028
-
MMBtu
$313 $(-142.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs