Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,665

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Fruit and vegetable preserving and specialty food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2614 #08 Y:2026 Eliminate or reduce compressed air usage $474 $403
UL2614 #07 Y:2026 Use waste heat from hot flue gases to preheat $9,873 $32,500
UL2614 #06 Y:2026 Use solar heat to make electricty $15,745 $220,724
UL2614 #05 Y:2026 Optimize plant power factor $3,431 $7,370
UL2614 #04 Y:2026 Install / repair insulation on steam lines $2,638 $2,392
UL2614 #03 Y:2026 Use outside cold water source as a supply of cooling water $13,075 $57,069
UL2614 #02 Y:2026 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $569 $350
UL2614 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $292 $91
SU0605 #08 Y:2026 Install vinyl strip / high speed / air curtain doors $1,230 $4,746
SU0605 #07 Y:2026 Conserve energy by efficient use of vending machines $104 $187
SU0605 #06 Y:2026 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $801 $1,268
SU0605 #05 Y:2026 Install / repair insulation on steam lines $266 $408
SU0605 #04 Y:2026 Use or replace with energy efficient substitutes $404 $303
SU0605 #03 Y:2026 Reduce space conditioning during non-working hours $9,917 $200
SU0605 #02 Y:2026 Eliminate/reduce an operation $51 -
SU0605 #01 Y:2026 Reschedule plant operations or reduce load to avoid peaks $5,844 -
GT1009 #07 Y:2026 Use solar heat to make electricty $46,591 $848,967
GT1009 #06 Y:2026 Use / purchase optimum sized compressor $10,512 $45,000
GT1009 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $421 $1,050
GT1009 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $2,314 $5,500