ITAC Assessment: GT1009
ITAC logo
ITAC Assessment: GT1009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Juices and Smoothies
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 160,000
ft2
Annual Production 3,600,000
units
Production Hrs. Annual 5,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $263,184 2,302,680
kWh
Electricity Fees $1,640 -
Natural Gas $11,585 1,019
MMBtu
TOTAL YEARLY COSTS $276,409
RECOMMENDED SAVINGS* $64,424 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $1,430 $200 - $1,430 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $986 $300 $986
8,645
kWh
- -
03 2.7224: Reduce space conditioning during non-working hours $2,170 $1,350 $2,170
19,039
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,314 $5,500 $2,314
20,297
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $421 $1,050 $1,871
16,408
kWh
- $(-1,450.0)
06 2.4226: Use / purchase optimum sized compressor $10,512 $45,000 $10,512
92,213
kWh
- -
07 2.9114: Use solar heat to make electricty $46,591 $848,967 $46,591
407,638
kWh
- -
TOTAL RECOMMENDED $64,424 $902,367 $64,444
564,240
kWh
$1,430 $(-1,450.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs