162
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Confectionery manufacturing from purchased chocolate | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0447 #05 Y:2017 | 05 | 2017 | Utilize higher efficiency lamps and/or ballasts | $1,669 | $5,100 | |
| LE0447 #04 Y:2017 | 04 | 2017 | Utilize higher efficiency lamps and/or ballasts | $5,116 | $9,180 | |
| LE0447 #03 Y:2017 | 03 | 2017 | Replace existing hvac unit with high efficiency model | $64,766 | $55,000 | |
| LE0447 #02 Y:2017 | 02 | 2017 | Reduce the pressure of compressed air to the minimum required | $1,075 | $800 | |
| LE0447 #01 Y:2017 | 01 | 2017 | Re-use or recycle hot or cold process exhaust air | $1,465 | $500 | |
| BS0019 #10 Y:2013 | 10 | 2013 | Install / repair insulation on steam lines | $142 | $551 | |
| BS0019 #09 Y:2013 | 09 | 2013 | Analyze flue gas for proper air/fuel ratio | $165 | $120 | |
| BS0019 #08 Y:2013 | 08 | 2013 | Reduce space conditioning during non-working hours | $310 | $25 | |
| BS0019 #07 Y:2013 | 07 | 2013 | Use highest temperature for chilling or cold storage | $23 | $25 | |
| BS0019 #06 Y:2013 | 06 | 2013 | Use most efficient type of electric motors | $197 | $349 | |
| BS0019 #05 Y:2013 | 05 | 2013 | Utilize energy-efficient belts and other improved mechanisms | $47 | $36 | |
| BS0019 #04 Y:2013 | 04 | 2013 | Eliminate or reduce compressed air usage | $41 | $81 | |
| BS0019 #03 Y:2013 | 03 | 2013 | Install compressor air intakes in coolest locations | $84 | $157 | |
| BS0019 #02 Y:2013 | 02 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $342 | $349 | |
| BS0019 #01 Y:2013 | 01 | 2013 | Reduce the pressure of compressed air to the minimum required | $187 | $364 | |
| SF0406 #10 Y:2011 | 10 | 2011 | Install occupancy sensors | $4,954 | $21,408 | |
| SF0406 #09 Y:2011 | 09 | 2011 | Use heat from boiler blowdown to preheat boiler feed water | $2,696 | $10,439 | |
| SF0406 #08 Y:2011 | 08 | 2011 | Install smaller boiler (increase high fire duty cycle) | $25,304 | $93,999 | |
| SF0406 #07 Y:2011 | 07 | 2011 | Use cooling tower water instead of refrigeration | $90,076 | $288,023 | |
| SF0406 #06 Y:2011 | 06 | 2011 | Install timers on light switches in little used areas | $1,352 | $1,460 |