Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

162

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Confectionery manufacturing from purchased chocolate
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0447 #05 Y:2017 Utilize higher efficiency lamps and/or ballasts $1,669 $5,100
LE0447 #04 Y:2017 Utilize higher efficiency lamps and/or ballasts $5,116 $9,180
LE0447 #03 Y:2017 Replace existing hvac unit with high efficiency model $64,766 $55,000
LE0447 #02 Y:2017 Reduce the pressure of compressed air to the minimum required $1,075 $800
LE0447 #01 Y:2017 Re-use or recycle hot or cold process exhaust air $1,465 $500
BS0019 #10 Y:2013 Install / repair insulation on steam lines $142 $551
BS0019 #09 Y:2013 Analyze flue gas for proper air/fuel ratio $165 $120
BS0019 #08 Y:2013 Reduce space conditioning during non-working hours $310 $25
BS0019 #07 Y:2013 Use highest temperature for chilling or cold storage $23 $25
BS0019 #06 Y:2013 Use most efficient type of electric motors $197 $349
BS0019 #05 Y:2013 Utilize energy-efficient belts and other improved mechanisms $47 $36
BS0019 #04 Y:2013 Eliminate or reduce compressed air usage $41 $81
BS0019 #03 Y:2013 Install compressor air intakes in coolest locations $84 $157
BS0019 #02 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $342 $349
BS0019 #01 Y:2013 Reduce the pressure of compressed air to the minimum required $187 $364
SF0406 #10 Y:2011 Install occupancy sensors $4,954 $21,408
SF0406 #09 Y:2011 Use heat from boiler blowdown to preheat boiler feed water $2,696 $10,439
SF0406 #08 Y:2011 Install smaller boiler (increase high fire duty cycle) $25,304 $93,999
SF0406 #07 Y:2011 Use cooling tower water instead of refrigeration $90,076 $288,023
SF0406 #06 Y:2011 Install timers on light switches in little used areas $1,352 $1,460