Assessment Year | 2012 |
---|---|
Principal Product | Candy(Chocolate and Yogurt) |
NAICS | 311352: Confectionery Manufacturing from Purchased Chocolate |
SIC | 2064: Candy and Other Confectionery Products |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
300,000
ft2
|
Annual Production | 2,000,000
units
|
Production Hrs. Annual | 6,936
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $531,380 | 7,979,320 |
kWh
|
$0.067 |
Electricity Demand | $302,644 | 17,088 |
kW-mo/yr
|
$17.71 |
Natural Gas | $233,179 | 47,236 |
MMBtu
|
$4.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $169,847 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,836 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,385 | - |
$7,385
110,890
kWh
|
- | - | |
02 | 2.7224: Reduce space conditioning during non-working hours | $10,401 | - |
$6,314
94,806
kWh
|
- |
$4,087
-
MMBtu
|
|
03 | 2.2122: Install / repair insulation on condensate lines | $2,483 | - | - | - |
$2,483
-
MMBtu
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,629 | $818 |
$12,074
181,291
kWh
|
$5,555
-
kW-mo/yr
|
- | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $7,567 | $3,773 |
$5,183
77,822
kWh
|
$2,384
-
kW-mo/yr
|
- | |
06 | 2.7132: Install timers on light switches in little used areas | $1,352 | $1,460 |
$926
13,903
kWh
|
$426
-
kW-mo/yr
|
- | |
07 | 2.2612: Use cooling tower water instead of refrigeration | $90,076 | $288,023 |
$62,725
941,818
kWh
|
$27,351
-
kW-mo/yr
|
- | |
08 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $25,304 | $93,999 |
$2,684
40,305
kWh
|
$1,239
-
kW-mo/yr
|
$21,381
-
MMBtu
|
|
09 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $2,696 | $10,439 | - | - |
$2,696
-
MMBtu
|
|
10 | 2.7135: Install occupancy sensors | $4,954 | $21,408 |
$2,630
39,486
kWh
|
$2,324
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $169,847 | $419,920 |
$99,921
1,500,321
kWh
|
$39,279
-
kW-mo/yr
|
$30,647
-
MMBtu
|
||
TOTAL IMPLEMENTED | $27,836 | $3,773 |
$18,882
283,518
kWh
|
$2,384
-
kW-mo/yr
|
$6,570
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs