ITAC Assessment: LE0447
ITAC logo
ITAC Assessment: LE0447
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Dry fudge mixes
NAICS 311352: Confectionery Manufacturing from Purchased Chocolate
SIC 2064: Candy and Other Confectionery Products
Sales Range $1
M
to 5
M
# of Employees 29
Plant Area 48,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 3,640
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,003 1,271,600
kWh
Electricity Demand $91,067 5,208
kW-mo/yr
Natural Gas $29,827 3,339
MMBtu
TOTAL YEARLY COSTS $209,897
RECOMMENDED SAVINGS* $76,426 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,841

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $1,465 $500 - - $1,465
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,075 $800 $550
7,862
kWh
$525
-
kW-mo/yr
-
03 2.7232: Replace existing hvac unit with high efficiency model $64,766 $55,000 $56,948
813,540
kWh
$7,818
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,116 $9,180 $2,807
40,098
kWh
$2,309
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,669 $5,100 $917
13,104
kWh
$752
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,934 $7,813 $1,147
16,380
kWh
$787
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $401 $1,700 $184
2,633
kWh
$217
-
kW-mo/yr
-
TOTAL RECOMMENDED $76,426 $80,093 $62,553
893,617
kWh
$12,408
-
kW-mo/yr
$1,465
-
MMBtu
TOTAL IMPLEMENTED $65,841 $55,800 $57,498
821,402
kWh
$8,343
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings