Assessment Year | 2017 |
---|---|
Principal Product | Dry fudge mixes |
NAICS | 311352: Confectionery Manufacturing from Purchased Chocolate |
SIC | 2064: Candy and Other Confectionery Products |
Sales Range | $1 M to 5M |
# of Employees | 29 |
Plant Area |
48,000
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 3,640
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $89,003 | 1,271,600 |
kWh
|
$0.070 |
Electricity Demand | $91,067 | 5,208 |
kW-mo/yr
|
$17.49 |
Natural Gas | $29,827 | 3,339 |
MMBtu
|
$8.93 |
TOTAL YEARLY COSTS | $209,897 | |||
RECOMMENDED SAVINGS* | $76,426 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $65,841 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2443: Re-use or recycle hot or cold process exhaust air | $1,465 | $500 | - | - |
$1,465
-
MMBtu
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,075 | $800 |
$550
7,862
kWh
|
$525
-
kW-mo/yr
|
- | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $64,766 | $55,000 |
$56,948
813,540
kWh
|
$7,818
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,116 | $9,180 |
$2,807
40,098
kWh
|
$2,309
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,669 | $5,100 |
$917
13,104
kWh
|
$752
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,934 | $7,813 |
$1,147
16,380
kWh
|
$787
-
kW-mo/yr
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $401 | $1,700 |
$184
2,633
kWh
|
$217
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $76,426 | $80,093 |
$62,553
893,617
kWh
|
$12,408
-
kW-mo/yr
|
$1,465
-
MMBtu
|
||
TOTAL IMPLEMENTED | $65,841 | $55,800 |
$57,498
821,402
kWh
|
$8,343
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs