ITAC Assessment: BS0019
ITAC logo
ITAC Assessment: BS0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Chocolate and Confectionary Products
NAICS 311352: Confectionery Manufacturing from Purchased Chocolate
SIC 2064: Candy and Other Confectionery Products
Sales Range $1
M
to 5
M
# of Employees 17
Plant Area 24,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $7,362 164,960
kWh
Electricity Demand $2,549 778
kW-mo/yr
Electricity Fees $1,580 -
Natural Gas $7,955 1,116
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,538 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $957

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $187 $364 $127
2,614
kWh
$60
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $342 $349 $232
4,790
kWh
$110
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $84 $157 $49
1,016
kWh
$35
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $41 $81 $28
569
kWh
$13
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $47 $36 $47
961
kWh
- -
06 2.4133: Use most efficient type of electric motors $197 $349 $182
3,758
kWh
$15
-
kW-mo/yr
-
07 2.2694: Use highest temperature for chilling or cold storage $23 $25 $23
467
kWh
- -
08 2.7224: Reduce space conditioning during non-working hours $310 $25 $310
6,385
kWh
- -
09 2.1233: Analyze flue gas for proper air/fuel ratio $165 $120 - - $165
-
MMBtu
10 2.2136: Install / repair insulation on steam lines $142 $551 - - $142
-
MMBtu
TOTAL RECOMMENDED $1,538 $2,057 $998
20,560
kWh
$233
-
kW-mo/yr
$307
-
MMBtu
TOTAL IMPLEMENTED $957 $1,511 $512
10,545
kWh
$138
-
kW-mo/yr
$307
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs