ITAC Assessment: MA0151
ITAC logo
ITAC Assessment: MA0151
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product FILTER MEMBRANES
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 8,736
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $303,612 4,745,897
kWh
Natural Gas $24,028 4,268
MMBtu
Fuel Oil #2 $104,740 25,760
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,428 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,531

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Fuel Oil #4 Savings
01 2.4221: Install compressor air intakes in coolest locations $5,228 $426 $5,228
81,770
kWh
- - -
02 2.4222: Install adequate dryers on air lines to eliminate blowdown $1,218 $305 $1,218
19,050
kWh
- - -
03 2.7291: Reschedule and rearrange multiple-source heating systems $4,308 $243 - $11,737
-
MMBtu
$(-7,429.0)
-
MMBtu
-
04 2.1331: Burn a less expensive grade of fuel $12,509 $15,150 - - $104,967
-
MMBtu
$(-92,458.0)
-
MMBtu
05 2.1213: Direct warmest air to combustion intake $1,022 $593 - - - $1,022
-
MMBtu
06 2.2428: Use flue gases in radiant heater for space heating, ovens, etc $1,093 $592 - - - $1,093
-
MMBtu
07 2.2437: Recover waste heat from equipment $2,050 $3,150 - - - $2,050
-
MMBtu
TOTAL RECOMMENDED $27,428 $20,459 $6,446
100,820
kWh
$11,737
-
MMBtu
$97,538
-
MMBtu
$(-88,293.0)
-
MMBtu
TOTAL IMPLEMENTED $13,531 $15,743 - - $104,967
-
MMBtu
$(-91,436.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs