ITAC Assessment: UF0270
ITAC logo
ITAC Assessment: UF0270
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Metal Galvanizing
NAICS
n/a
SIC 3579: Office Machines, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 58
Plant Area 10,000
ft2
Annual Production 17,000
ton
Production Hrs. Annual 4,992
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,459 1,147,080
kWh
Electricity Demand $17,364 229
kW-mo/yr
Natural Gas $186,228 41,757
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,770 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,259 $10,393 $6,258
95,746
kWh
$2,001
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $394 $518 $394
27
kWh
- -
03 2.8121: Apply for tax-free status for energy purchases $5,283 $50 - - $5,283
04 2.4133: Use most efficient type of electric motors $4,583 $15,092 $3,310
67,544
kWh
$1,273
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,461 $350 $1,461
22,862
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,414 - $1,414
21,433
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $532 $1,500 $532
10,859
kWh
- -
08 4.431: Train operators for maximum operating efficiency $4,992 $800 - - $4,992
09 4.652: Replace existing equipment with more suitable substitutes $852 $600 $244
4,993
kWh
$45
-
kW-mo/yr
$563
TOTAL RECOMMENDED $27,770 $29,303 $13,613
223,464
kWh
$3,319
-
kW-mo/yr
$10,838
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs