Assessment Year | 2001 |
---|---|
Principal Product | Metal Galvanizing |
NAICS |
n/a
|
SIC | 3579: Office Machines, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 58 |
Plant Area |
10,000
ft2
|
Annual Production | 17,000
ton
|
Production Hrs. Annual | 4,992
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $58,459 | 1,147,080 |
kWh
|
$0.051 |
Electricity Demand | $17,364 | 229 |
kW-mo/yr
|
$75.83 |
Natural Gas | $186,228 | 41,757 |
MMBtu
|
$4.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,770 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,259 | $10,393 |
$6,258
95,746
kWh
|
$2,001
-
kW-mo/yr
|
- | |
02 | 2.7135: Install occupancy sensors | $394 | $518 |
$394
27
kWh
|
- | - | |
03 | 2.8121: Apply for tax-free status for energy purchases | $5,283 | $50 | - | - | $5,283 | |
04 | 2.4133: Use most efficient type of electric motors | $4,583 | $15,092 |
$3,310
67,544
kWh
|
$1,273
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,461 | $350 |
$1,461
22,862
kWh
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,414 | - |
$1,414
21,433
kWh
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $532 | $1,500 |
$532
10,859
kWh
|
- | - | |
08 | 4.431: Train operators for maximum operating efficiency | $4,992 | $800 | - | - | $4,992 | |
09 | 4.652: Replace existing equipment with more suitable substitutes | $852 | $600 |
$244
4,993
kWh
|
$45
-
kW-mo/yr
|
$563 | |
TOTAL RECOMMENDED | $27,770 | $29,303 |
$13,613
223,464
kWh
|
$3,319
-
kW-mo/yr
|
$10,838 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs