ITAC Assessment: WV0407
ITAC logo
ITAC Assessment: WV0407
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product organo functional silanes
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area 457,000
ft2
Annual Production 38,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,655,601 55,103,450
kWh
Electricity Demand $877,398 88,405
kW-mo/yr
Natural Gas $4,177,623 560,430
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,506,959 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $259,038

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2423: Install waste heat boiler to produce steam $622,016 $798,300 $(-3,392.0)
(-73,518)
kWh
- $645,408
-
MMBtu
$(-20,000.0)
02 2.3321: Use steam pressure reduction to generate power $542,540 $1,200,000 $1,269,597
42,249,480
kWh
$574,130
-
kW-mo/yr
$(-1,301,187.0)
-
MMBtu
-
03 2.2113: Repair or replace steam traps $235,631 $5,500 - - $258,671
-
MMBtu
$(-23,040.0)
04 2.7231: Use radiant heater for spot heating $43,962 $96,200 - - $43,962
-
MMBtu
-
05 2.1213: Direct warmest air to combustion intake $20,301 $7,920 - - $20,301
-
MMBtu
-
06 2.2437: Recover waste heat from equipment $19,102 $43,400 - - $19,102
-
MMBtu
-
07 2.4151: Develop a repair/replace policy $10,842 $772 $7,995
266,069
kWh
$3,615
-
kW-mo/yr
- $(-768.0)
08 2.7142: Utilize higher efficiency lamps and/or ballasts $5,003 $17,348 $3,274
108,939
kWh
$1,729
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $3,209 $7,158 $2,207
73,435
kWh
$1,002
-
kW-mo/yr
- -
10 2.4157: Establish a predictive maintenance program $4,353 $1,000 $5,997
199,551
kWh
$2,708
-
kW-mo/yr
- $(-4,352.0)
TOTAL RECOMMENDED $1,506,959 $2,177,598 $1,285,678
42,823,956
kWh
$583,184
-
kW-mo/yr
$(-313,743.0)
-
MMBtu
$(-48,160.0)
TOTAL IMPLEMENTED $259,038 $31,778 $19,473
647,994
kWh
$9,054
-
kW-mo/yr
$258,671
-
MMBtu
$(-28,160.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs