Assessment Year | 2019 |
---|---|
Principal Product | Automotive Electronics |
NAICS | 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing |
SIC | 3694: Electrical Equipment for Internal Combustion Engines |
Sales Range | $100 M to 500M |
# of Employees | 545 |
Plant Area |
135,000
ft2
|
Annual Production | 12,460,000
units
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,046,625 | 17,430,300 |
kWh
|
$0.060 | |
Electricity Demand | $302,478 | 36,225 |
kW-mo/yr
|
$8.35 | |
Natural Gas | $63,214 | 5,647 |
MMBtu
|
$11.19 | |
Waste Disposal Costs | |||||
Water Usage | $4,188 | 1,447 |
Tgal
|
$2.89 | |
Water Disposal | $12,234 | 1,447 |
Tgal
|
$8.45 | |
TOTAL YEARLY COSTS | $1,428,739 | ||||
RECOMMENDED SAVINGS* | $206,759 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $9,228 | $3,681 |
$7,500
124,947
kWh
|
$1,728
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,073 | - |
$3,073
51,222
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $7,795 | $14,400 |
$7,795
129,920
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $53,325 | $243,934 |
$41,468
691,125
kWh
|
$11,857
-
kW-mo/yr
|
- | |
05 | 2.7145: Install skylights | $18,882 | $84,800 |
$18,882
314,703
kWh
|
- | - | |
06 | 2.7141: Lower light fixtures in high ceiling areas | $364 | $1,800 |
$234
3,900
kWh
|
$130
-
kW-mo/yr
|
- | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $2,714 | $720 |
$2,203
36,720
kWh
|
$511
-
kW-mo/yr
|
- | |
08 | 2.7232: Replace existing hvac unit with high efficiency model | $64,369 | $260,000 |
$64,369
1,072,817
kWh
|
- | - | |
09 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $854 | $660 |
$854
14,240
kWh
|
- | - | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,940 | $4,150 |
$2,940
49,000
kWh
|
- | - | |
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $828 | $1,150 |
$705
11,760
kWh
|
$123
-
kW-mo/yr
|
- | |
12 | 2.1213: Direct warmest air to combustion intake | $986 | $3,960 |
$986
16,428
kWh
|
- | - | |
13 | 2.2511: Insulate bare equipment | $481 | $419 |
$481
8,019
kWh
|
- | - | |
14 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $40,920 | $180,000 |
$93,312
1,555,200
kWh
|
$21,643
-
kW-mo/yr
|
$(-74,035.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $206,759 | $799,674 |
$244,802
4,080,001
kWh
|
$35,992
-
kW-mo/yr
|
$(-74,035.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs