Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

420

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Sugar and confectionery product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0625 #11 Y:2024 Use solar heat to make electricty $177,385 $2,104,448
SF0625 #10 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,369 $7,928
SF0625 #09 Y:2024 Utilize controls to operate equipment only when needed $14,307 $15,295
SF0625 #08 Y:2024 Utilize a less expensive cooling method $155,547 $160,389
SF0625 #07 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $11,943 $10,277
SF0625 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $12,576 $3,859
SF0625 #05 Y:2024 Increase amount of condensate returned $26,010 $8,735
SF0625 #04 Y:2024 Utilize controls to operate equipment only when needed $5,071 $854
SF0625 #03 Y:2024 Repair and eliminate steam leaks $8,671 $516
SF0625 #02 Y:2024 Reduce space conditioning during non-working hours $8,680 $588
SF0625 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,669 -
UU0235 #04 Y:2023 Use optimum thickness insulation $6,968 $8,826
UU0235 #03 Y:2023 Insulate bare equipment $12,478 $23,282
UU0235 #02 Y:2023 Use steam sparging or injections in place of indirect heating $271,861 $3,050,000
UU0235 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,664 $1,013
LS2314 #06 Y:2023 Use solar heat to make electricty $40,199 $309,000
LS2314 #05 Y:2023 Use most efficient type of electric motors $25,291 $89,400
LS2314 #04 Y:2023 Utilize energy-efficient belts and other improved mechanisms $12,651 $11,390
LS2314 #03 Y:2023 Insulate bare equipment $3,222 $660
LS2314 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $3,404 $135