Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Breakfast cereal manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0230 #07 Y:2023 Utilize controls to operate equipment only when needed $3,919 $2,200
DL0230 #06 Y:2023 Use hot process fluids to preheat incoming process fluids $15,141 $10,000
DL0230 #05 Y:2023 Utilize controls to operate equipment only when needed $11,418 -
DL0230 #04 Y:2023 Recover waste heat from equipment $3,146 $2,040
DL0230 #03 Y:2023 Upgrade controls on compressors $100,915 $74,000
DL0230 #02 Y:2023 Install desiccant humidity control system $44,058 $22,437
DL0230 #01 Y:2023 Upgrade controls on compressors $13,779 $15,504
CI0023 #09 Y:2023 Replace existing equipment with more suitable substitutes $2,250 $13,000
CI0023 #08 Y:2023 Recover waste heat from equipment $3,797 $5,000
CI0023 #07 Y:2023 Recharge batteries on during off-peak demand periods $5,670 $7,500
CI0023 #06 Y:2023 Utilize higher efficiency lamps and/or ballasts $5,881 $2,299
CI0023 #05 Y:2023 Install occupancy sensors $7,791 $2,625
CI0023 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $7,902 $300
CI0023 #03 Y:2023 Replace boiler $13,894 $30,000
CI0023 #02 Y:2023 Insulate bare equipment $45,480 $17,533
CI0023 #01 Y:2023 Use solar heat to make electricty $78,738 $658,288
IC0220 #06 Y:2019 Minimize water usage $9,210 $11,980
IC0220 #05 Y:2019 Utilize controls to operate equipment only when needed $274 $250
IC0220 #04 Y:2019 Use flow control valves on equipment to optimize water use $37,319 $5,747
IC0220 #03 Y:2019 Repair or replace steam traps $17,321 $4,875