Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Soybean and other oilseed processing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0532 #07 Y:2018 Replace boiler $20,414 $108,576
SF0532 #06 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $2,025 $8,491
SF0532 #05 Y:2018 Reduce the pressure of compressed air to the minimum required $950 $2,757
SF0532 #04 Y:2018 Insulate bare equipment $1,777 $4,972
SF0532 #03 Y:2018 Insulate bare equipment $2,762 $4,681
SF0532 #02 Y:2018 Utilize higher efficiency lamps and/or ballasts $13,844 $20,718
SF0532 #01 Y:2018 Turn off equipment when not in use $879 -
SF0530 #08 Y:2018 Use solar heat to make electricty $97,224 $532,260
SF0530 #07 Y:2018 Modify refrigeration system to operate at a lower pressure $14,120 $58,070
SF0530 #06 Y:2018 Utilize energy-efficient belts and other improved mechanisms $209 $564
SF0530 #05 Y:2018 Install / repair insulation on condensate lines $1,743 $4,357
SF0530 #04 Y:2018 Establish burner maintenance schedule for boilers $5,255 $11,220
SF0530 #03 Y:2018 Utilize higher efficiency lamps and/or ballasts $47,808 $97,552
SF0530 #02 Y:2018 Upgrade controls on compressors $13,070 $22,633
SF0530 #01 Y:2018 Install timers and/or thermostats $6,177 $2,407
NL0020 #04 Y:2017 Use computer programs to optimize hvac performance $81 $200
NL0020 #03 Y:2017 Use most efficient type of electric motors $543 $2,476
NL0020 #02 Y:2017 Air condition only space necessary $1,869 $56
NL0020 #01 Y:2017 Utilize higher efficiency lamps and/or ballasts $22,414 $29,401
SF0508 #06 Y:2017 Preheat boiler makeup water with waste process heat $1,181 $6,155