Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Tofu and Soy Products
NAICS 311224: Soybean and Other Oilseed Processing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 35,000
ft2
Annual Production 6,300,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,442 962,538
kWh
Electricity Demand $58,061 2,184
kW-mo/yr
Natural Gas $144,043 13,576
MMBtu
TOTAL YEARLY COSTS $350,545
RECOMMENDED SAVINGS* $42,651 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,112

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $879 - $879
5,697
kWh
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $13,844 $20,718 $10,186
67,351
kWh
$3,184
-
kW-mo/yr
- $619 $(-145.0)
03 2.2511: Insulate bare equipment $2,762 $4,681 - - $2,762
-
MMBtu
- -
04 2.2511: Insulate bare equipment $1,777 $4,972 - - $1,777
-
MMBtu
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $950 $2,757 $769
4,986
kWh
$181
-
kW-mo/yr
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,025 $8,491 $2,025
13,131
kWh
- - - -
07 2.1224: Replace boiler $20,414 $108,576 - - $20,414
-
MMBtu
- -
TOTAL RECOMMENDED $42,651 $150,195 $13,859
91,165
kWh
$3,365
-
kW-mo/yr
$24,953
-
MMBtu
$619 $(-145.0)
TOTAL IMPLEMENTED $38,112 $140,542 $13,859
91,165
kWh
$3,365
-
kW-mo/yr
$20,414
-
MMBtu
$619 $(-145.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings