Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

191

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Starch and vegetable fats and oils manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0347 #07 Y:2023 Eliminate or reduce compressed air usage $6,124 $22,000
MZ0347 #06 Y:2023 Repair and eliminate steam leaks $1,668 $380
MZ0347 #05 Y:2023 Utilize energy-efficient belts and other improved mechanisms $1,018 $1,320
MZ0347 #04 Y:2023 Utilize controls to operate equipment only when needed $2,683 -
MZ0347 #03 Y:2023 Eliminate or reduce compressed air usage $13,827 $220
MZ0347 #02 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $91,034 $35,384
MZ0347 #01 Y:2023 Install occupancy sensors $3,495 $1,500
LE0540 #07 Y:2022 Preheat combustion air with waste heat $128,214 $580,000
LE0540 #06 Y:2022 Preheat combustion air with waste heat $11,386 $45,000
LE0540 #05 Y:2022 Insulate bare equipment $1,080 $1,908
LE0540 #04 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $5,521 $9,000
LE0540 #03 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $27,247 $36,000
LE0540 #02 Y:2022 Install occupancy sensors $841 $1,040
LE0540 #01 Y:2022 Use most efficient type of electric motors $16,565 $11,000
SF0532 #07 Y:2018 Replace boiler $20,414 $108,576
SF0532 #06 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $2,025 $8,491
SF0532 #05 Y:2018 Reduce the pressure of compressed air to the minimum required $950 $2,757
SF0532 #04 Y:2018 Insulate bare equipment $1,777 $4,972
SF0532 #03 Y:2018 Insulate bare equipment $2,762 $4,681
SF0532 #02 Y:2018 Utilize higher efficiency lamps and/or ballasts $13,844 $20,718