Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

139

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Flour milling
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0562 #04 Y:2024 Meter recycled water (to reduce sewer charges) $4,836 $5,000
LE0562 #03 Y:2024 Use / purchase optimum sized compressor $27,865 $27,000
LE0562 #02 Y:2024 Install occupancy sensors $1,612 $350
LE0562 #01 Y:2024 Install timers and/or thermostats $4,513 $320
MZ0338 #06 Y:2023 Lower temperature during the winter season and vice-versa $2,195 $240
MZ0338 #05 Y:2023 Utilize higher efficiency lamps and/or ballasts $4,644 $13,800
MZ0338 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $60,112 $127,747
MZ0338 #03 Y:2023 Install occupancy sensors $2,124 $3,920
MZ0338 #02 Y:2023 Utilize a less expensive cooling method $2,823 $860
MZ0338 #01 Y:2023 Use solar heat to make electricty $576,991 $4,487,250
SD0607 #08 Y:2021 Use most efficient type of electric motors $487 $540
SD0607 #07 Y:2021 Install compressor air intakes in coolest locations $481 $706
SD0607 #06 Y:2021 Reduce illumination to minimum necessary levels $794 $760
SD0607 #05 Y:2021 Utilize higher efficiency lamps and/or ballasts $3,289 $2,741
SD0607 #04 Y:2021 Utilize energy-efficient belts and other improved mechanisms $2,753 $568
SD0607 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $13,885 $2,100
SD0607 #02 Y:2021 Replace existing hvac unit with high efficiency model $17,809 $38,800
SD0607 #01 Y:2021 Recharge batteries on during off-peak demand periods $26,888 $500
LE0499 #04 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $6,271 $5,600
LE0499 #03 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $73,216 $57,400