Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

336

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Flour milling and malt manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LL0248 #06 Y:2006 Replace existing equipment with more suitable substitutes $900 $300
LL0248 #05 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $959 $151
LL0248 #04 Y:2006 Reduce the pressure of compressed air to the minimum required $1,082 $20
LL0248 #03 Y:2006 Begin a practice of predictive / preventative maintenance $1,218 $80
LL0248 #02 Y:2006 Utilize higher efficiency lamps and/or ballasts $10,463 $1,022
LL0248 #01 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $21,816 $14,656
IA0384 #07 Y:2005 Install / repair insulation on steam lines $785 $990
IA0384 #06 Y:2005 Analyze flue gas for proper air/fuel ratio $747 $1,000
IA0384 #05 Y:2005 Install occupancy sensors $1,278 $924
IA0384 #04 Y:2005 Utilize higher efficiency lamps and/or ballasts $1,056 $1,826
IA0384 #03 Y:2005 Utilize higher efficiency lamps and/or ballasts $710 $735
IA0384 #02 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $4,970 $1,000
IA0384 #01 Y:2005 Reduce the pressure of compressed air to the minimum required $2,454 $200
OR0494 #15 Y:2005 Turn off equipment when not in use $7,580 $19,700
OR0494 #14 Y:2005 Modify process to reduce material use/cost $107,700 $340,000
OR0494 #13 Y:2005 Utilize higher efficiency lamps and/or ballasts $22,800 $49,400
OR0494 #12 Y:2005 Upgrade obsolete equipment $1,100 $1,300
OR0494 #11 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $6,400 $6,500
OR0494 #10 Y:2005 Upgrade controls on compressors $3,500 $2,320
OR0494 #09 Y:2005 Reduce fluid flow rates $2,400 -