ITAC Assessment: OR0494
ITAC logo
ITAC Assessment: OR0494
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Malted Barley
NAICS 311213: Malt Manufacturing
SIC 2083: Malt
Sales Range $50
M
to 100
M
# of Employees 21
Plant Area 350,000
ft2
Annual Production 160,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,078 23,407,670
kWh
Electricity Demand $27,770 4,408
kW-mo/yr
Natural Gas $2,155,106 343,044
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $447,080 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $321,100

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
01 2.2414: Use waste heat from hot flue gases to preheat $77,000 - - - $77,000
-
MMBtu
- -
02 2.5123: Reduce fluid flow rates $63,500 - $6,500
156,000
kWh
- $57,000
-
MMBtu
- -
03 2.5123: Reduce fluid flow rates $54,700 $630 $9,700
233,000
kWh
$4,000
-
kW-mo/yr
$41,000
-
MMBtu
- -
04 2.5121: Redesign flow to minimize mass transfer length $36,800 $1,400 $36,800
884,900
kWh
- - - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $55,000 $3,100 - - $55,000
-
MMBtu
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $5,100 - $4,300
103,000
kWh
$800
-
kW-mo/yr
- - -
07 2.7124: Make a practice of turning off lights when not needed $2,400 - $2,000
48,200
kWh
$400
-
kW-mo/yr
- - -
08 2.4239: Eliminate or reduce compressed air usage $1,100 - $920
22,000
kWh
$180
-
kW-mo/yr
- - -
09 2.5123: Reduce fluid flow rates $2,400 - $5,400
128,800
kWh
- $(-3,000.0)
-
MMBtu
- -
10 2.4224: Upgrade controls on compressors $3,500 $2,320 $3,000
70,000
kWh
$500
-
kW-mo/yr
- - -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,400 $6,500 $5,400
130,000
kWh
$1,000
-
kW-mo/yr
- - -
12 2.4321: Upgrade obsolete equipment $1,100 $1,300 $900
22,000
kWh
$200
-
kW-mo/yr
- - -
13 2.7142: Utilize higher efficiency lamps and/or ballasts $22,800 $49,400 $10,000
241,700
kWh
$1,800
-
kW-mo/yr
- $11,000 -
14 4.131: Modify process to reduce material use/cost $107,700 $340,000 $3,700
90,000
kWh
- $54,000
-
MMBtu
- $50,000
15 2.6218: Turn off equipment when not in use $7,580 $19,700 $7,580
91,100
kWh
- - - -
TOTAL RECOMMENDED $447,080 $424,350 $96,200
2,220,700
kWh
$8,880
-
kW-mo/yr
$281,000
-
MMBtu
$11,000 $50,000
TOTAL IMPLEMENTED $321,100 $399,630 $47,920
1,152,700
kWh
$8,180
-
kW-mo/yr
$204,000
-
MMBtu
$11,000 $50,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs