Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

661

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Grain and oilseed milling
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LL0233 #02 Y:2005 Insulate bare equipment $38,693 -
LL0233 #01 Y:2005 Use adjustable frequency drive or multiple speed motors on existing system $56,386 $73,240
LL0232 #13 Y:2005 Begin a practice of predictive / preventative maintenance $7,350 $3,010
LL0232 #12 Y:2005 Utilize higher efficiency lamps and/or ballasts $1,185 $1,120
LL0232 #11 Y:2005 Install occupancy sensors $597 -
LL0232 #10 Y:2005 Reduce space conditioning during non-working hours $756 -
LL0232 #09 Y:2005 Use photocell controls $2,101 $700
LL0232 #08 Y:2005 Air condition only space necessary $5,876 $60
LL0232 #07 Y:2005 Utilize higher efficiency lamps and/or ballasts $9,717 $2,000
LL0232 #06 Y:2005 Install compressor air intakes in coolest locations $10,014 -
LL0232 #05 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $35,683 $27,760
LL0232 #04 Y:2005 Reduce illumination to minimum necessary levels $43,777 $6,100
LL0232 #03 Y:2005 Preheat combustion air with waste heat $44,802 $20,000
LL0232 #02 Y:2005 Insulate bare equipment $70,461 -
LL0232 #01 Y:2005 Eliminate or reduce compressed air usage $91,143 -
SF0311 #17 Y:2005 Reuse / recycle/ sell paper products $19,680 $12,330
SF0311 #16 Y:2005 Eliminate/reduce an operation $1,600 -
SF0311 #15 Y:2005 Modify startup/shutdown times $3,118 $13,200
SF0311 #14 Y:2005 Use heat from boiler blowdown to preheat boiler feed water $22,029 $46,851
SF0311 #13 Y:2005 Install adequate dryers on air lines to eliminate blowdown $345 $658