ITAC Assessment: LL0233
ITAC logo
ITAC Assessment: LL0233
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Soybean milling
NAICS 311212: Rice Milling
SIC 2044: Rice Milling
Sales Range $100
M
to 500
M
# of Employees 280
Plant Area 285,000
ft2
Annual Production 45,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,020,194 52,710,092
kWh
Electricity Demand $998,177 92,544
kW-mo/yr
Electricity Fees $80,942 -
Natural Gas $1,607,095 288,216
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $174,770 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $122,756

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $56,386 $73,240 $54,217
2,801,924
kWh
- $2,169 -
02 2.2511: Insulate bare equipment $38,693 - - - - $38,693
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,619 $14,000 $16,941
875,513
kWh
- $678 -
04 2.3135: Schedule routine maintenance during non-operating periods $17,072 $2,900 - - - $17,072
-
MMBtu
05 2.7111: Reduce illumination to minimum necessary levels $15,391 $2,800 $8,454
436,916
kWh
$6,345
-
kW-mo/yr
$592 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $13,837 $3,400 $7,543
389,826
kWh
$5,762
-
kW-mo/yr
$532 -
07 2.2511: Insulate bare equipment $7,454 - - - - $7,454
-
MMBtu
08 2.2511: Insulate bare equipment $4,107 - - - - $4,107
-
MMBtu
09 2.7134: Use photocell controls $2,451 $450 $2,357
121,785
kWh
- $94 -
10 2.4239: Eliminate or reduce compressed air usage $1,243 - $1,196
61,806
kWh
- $47 -
11 2.7135: Install occupancy sensors $517 - $497
25,702
kWh
- $20 -
TOTAL RECOMMENDED $174,770 $96,790 $91,205
4,713,472
kWh
$12,107
-
kW-mo/yr
$4,132 $67,326
-
MMBtu
TOTAL IMPLEMENTED $122,756 $96,790 $89,512
4,625,964
kWh
$12,107
-
kW-mo/yr
$4,065 $17,072
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs