417
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Other animal food manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WM0099 #04 Y:2016 | 04 | 2016 | Use synthetic lubricant | $2,414 | $4,360 | |
| WM0099 #03 Y:2016 | 03 | 2016 | Utilize higher efficiency lamps and/or ballasts | $3,427 | $12,056 | |
| WM0099 #02 Y:2016 | 02 | 2016 | Reschedule plant operations or reduce load to avoid peaks | $3,528 | - | |
| WM0099 #01 Y:2016 | 01 | 2016 | Replace hydraulic / pneumatic equipment with electric equipment | $4,017 | $11,200 | |
| OK0956 #09 Y:2016 | 09 | 2016 | Install set-back timers | $237 | $50 | |
| OK0956 #08 Y:2016 | 08 | 2016 | Insulate bare equipment | $145 | $180 | |
| OK0956 #07 Y:2016 | 07 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $25,027 | $34,182 | |
| OK0956 #06 Y:2016 | 06 | 2016 | Install compressor air intakes in coolest locations | $492 | $1,325 | |
| OK0956 #05 Y:2016 | 05 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,910 | $3,000 | |
| OK0956 #04 Y:2016 | 04 | 2016 | Utilize higher efficiency lamps and/or ballasts | $1,000 | $1,488 | |
| OK0956 #03 Y:2016 | 03 | 2016 | Utilize higher efficiency lamps and/or ballasts | $8,914 | $51,634 | |
| OK0956 #02 Y:2016 | 02 | 2016 | Utilize higher efficiency lamps and/or ballasts | $3,155 | $2,536 | |
| OK0956 #01 Y:2016 | 01 | 2016 | Analyze flue gas for proper air/fuel ratio | $3,844 | $7,700 | |
| AM0717 #08 Y:2016 | 08 | 2016 | Use synthetic lubricant | $630 | - | |
| AM0717 #07 Y:2016 | 07 | 2016 | Reduce the pressure of compressed air to the minimum required | $800 | $10 | |
| AM0717 #06 Y:2016 | 06 | 2016 | Repair and eliminate steam leaks | $1,650 | $230 | |
| AM0717 #05 Y:2016 | 05 | 2016 | Eliminate or reduce compressed air usage | $2,060 | $410 | |
| AM0717 #04 Y:2016 | 04 | 2016 | Utilize higher efficiency lamps and/or ballasts | $2,610 | $4,060 | |
| AM0717 #03 Y:2016 | 03 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,700 | $1,000 | |
| AM0717 #02 Y:2016 | 02 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $3,200 | - |