Assessment Year | 2016 |
---|---|
Principal Product | Animal feed |
NAICS | 311119: Other Animal Food Manufacturing |
SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
90,000
ft2
|
Annual Production | 85,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $189,594 | 2,625,596 |
kWh
|
$0.072 |
Natural Gas | $33,594 | 8,594 |
MMBtu
|
$3.91 |
TOTAL YEARLY COSTS | $223,188 | |||
RECOMMENDED SAVINGS* | $45,723 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,844 | $7,700 | - |
$3,844
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,155 | $2,536 |
$3,155
43,820
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,914 | $51,634 |
$8,914
123,810
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,000 | $1,488 |
$1,000
13,891
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,910 | $3,000 |
$2,910
40,423
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $492 | $1,325 |
$492
6,792
kWh
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $25,027 | $34,182 |
$25,027
346,610
kWh
|
- | |
08 | 2.2511: Insulate bare equipment | $145 | $180 | - |
$145
-
MMBtu
|
|
09 | 2.6232: Install set-back timers | $237 | $50 |
$123
1,710
kWh
|
$113
-
MMBtu
|
|
TOTAL RECOMMENDED | $45,723 | $102,095 |
$41,621
577,056
kWh
|
$4,102
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs