ITAC Assessment: TN0218
ITAC logo
ITAC Assessment: TN0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product LIGHTING FIXTURES
NAICS
n/a
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 600,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,263 3,160,903
kWh
Natural Gas $340,427 67,342
MMBtu
LPG $12,728 1,832
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,901 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,029

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings Administrative Changes Savings
01 2.2422: Use waste heat from hot flue gases to generate steam $8,908 $15,000 - $8,588
-
MMBtu
$320
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,382 - - $1,719
-
MMBtu
$63
-
MMBtu
$(-400.0)
03 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $4,352 $3,700 $4,352
79,132
kWh
- - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,746 $180 - $1,683
-
MMBtu
$63
-
MMBtu
-
05 2.6212: Turn off equipment during breaks, reduce operating time $5,078 $4,350 $5,078
92,321
kWh
- - -
06 2.6212: Turn off equipment during breaks, reduce operating time $758 - $758
13,775
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $677 $90 $677
12,309
kWh
- - -
TOTAL RECOMMENDED $22,901 $23,320 $10,865
197,537
kWh
$11,990
-
MMBtu
$446
-
MMBtu
$(-400.0)
TOTAL IMPLEMENTED $5,029 $3,790 $5,029
91,441
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs