ITAC Assessment: AS0409
ITAC logo
ITAC Assessment: AS0409
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Paper bags
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2621: Paper Mills
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 121,000
ft2
Annual Production 33,600
ton
Production Hrs. Annual 6,072
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $511,350 6,288,996
kWh
Natural Gas $10,035 1,115
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,483 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,404 $11,000 $19,404
271,389
kWh
-
02 2.4224: Upgrade controls on compressors $13,305 $10,000 $13,305
185,086
kWh
-
03 2.4226: Use / purchase optimum sized compressor $7,055 $8,000 $7,055
98,669
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,097 $10,861 $2,097
40,370
kWh
-
05 2.7134: Use photocell controls $1,730 $4,650 $1,730
24,192
kWh
-
06 2.1213: Direct warmest air to combustion intake $1,337 $1,000 - $1,337
-
MMBtu
07 2.9112: Use solar heat to heat water $1,555 $12,000 $1,555
21,605
kWh
-
TOTAL RECOMMENDED $46,483 $57,511 $45,146
641,311
kWh
$1,337
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs