ITAC Assessment: SU0475
ITAC logo
ITAC Assessment: SU0475
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Mints, Rock Candies
NAICS 311351: Chocolate and Confectionery Manufacturing from Cacao Beans
SIC 2064: Candy and Other Confectionery Products
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 245,842
ft2
Annual Production 12,000,000
units
Production Hrs. Annual 4,290
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $208,426 3,805,316
kWh
Electricity Demand $49,806 5,988
kW-mo/yr
Natural Gas $162,421 42,950
MMBtu
Waste Disposal Costs
Water Disposal $64,300 10,459
Tgal
TOTAL YEARLY COSTS $484,953
RECOMMENDED SAVINGS* $14,439 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $388

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
01 4.821: Pay bills on time to avoid late fees $388 - - - - $388 -
02 2.4322: Use or replace with energy efficient substitutes $201 $100 $158
2,880
kWh
$80
-
kW-mo/yr
$(-37.0)
-
MMBtu
- -
03 3.1161: Eliminate/reduce an operation $10,247 $7,500 $(-32.4)
(-589)
kWh
$(-399.4)
-
kW-mo/yr
- - $10,679
04 2.4221: Install compressor air intakes in coolest locations $1,189 $1,231 $1,189
21,767
kWh
- - - -
05 2.6211: Conserve energy by efficient use of vending machines $136 $195 $136
2,477
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,279 $7,474 $989
18,046
kWh
$869
-
kW-mo/yr
- $421 -
TOTAL RECOMMENDED $14,439 $16,500 $2,439
44,581
kWh
$549
-
kW-mo/yr
$(-37.0)
-
MMBtu
$809 $10,679
TOTAL IMPLEMENTED $388 - - - - $388 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs