Assessment Year | 2001 |
---|---|
Principal Product | Nonferrous castings |
NAICS |
n/a
|
SIC | 3369: Nonferrous Foundries, Except Aluminum and Copper |
Sales Range | $5 M to 10M |
# of Employees | 60 |
Plant Area |
50,000
ft2
|
Annual Production | 1,000,000
lb
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $163,165 | 1,991,440 |
kWh
|
$0.082 |
Electricity Demand | $1,416 | 1,416 |
kW-mo/yr
|
$1.00 |
Natural Gas | $39,954 | 5,963 |
MMBtu
|
$6.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $74,747 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $33,158 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2443: Re-use or recycle hot or cold process exhaust air | $14,809 | $49,595 |
$14,809
185,114
kWh
|
- | - | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $16,104 | - | - |
$16,104
-
kW-mo/yr
|
- | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,154 | $1,600 |
$1,314
16,420
kWh
|
$443
-
kW-mo/yr
|
$(-603.0)
-
MMBtu
|
- | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $14,904 | $12,900 |
$12,830
160,380
kWh
|
$5,739
-
kW-mo/yr
|
$(-3,665.0)
-
MMBtu
|
- | |
05 | 2.2437: Recover waste heat from equipment | $10,676 | $7,500 |
$7,566
94,578
kWh
|
$3,110
-
kW-mo/yr
|
- | - | |
06 | 4.652: Replace existing equipment with more suitable substitutes | $17,100 | $12,300 | - | - | - | $17,100 | |
TOTAL RECOMMENDED | $74,747 | $83,895 |
$36,519
456,492
kWh
|
$25,396
-
kW-mo/yr
|
$(-4,268.0)
-
MMBtu
|
$17,100 | ||
TOTAL IMPLEMENTED | $33,158 | $26,800 |
$14,144
176,800
kWh
|
$6,182
-
kW-mo/yr
|
$(-4,268.0)
-
MMBtu
|
$17,100 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs