ITAC Assessment: MS0091
ITAC logo
ITAC Assessment: MS0091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product band saw blades
NAICS
n/a
SIC 3425: Saw Blades and Handsaws
Sales Range $10
M
to 50
M
# of Employees 139
Plant Area 330,000
ft2
Annual Production 15,000
thousand feet
Production Hrs. Annual 4,848
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $426,605 9,245,897
kWh
Electricity Demand $57,753 20,712
kW-mo/yr
Electricity Fees $113,098 -
Natural Gas $29,700 7,874
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,195 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,226

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,189 $20,713 $3,565
81,477
kWh
$627
-
kW-mo/yr
$997 - - - -
02 2.2414: Use waste heat from hot flue gases to preheat $2,473 $1,929 - - - $2,473
-
MMBtu
- - -
03 2.4221: Install compressor air intakes in coolest locations $1,842 $298 $1,336
30,481
kWh
$166
-
kW-mo/yr
$340 - - - -
04 2.4314: Use synthetic lubricant $3,735 $275 $2,673
60,961
kWh
$531
-
kW-mo/yr
$531 - - - -
05 3.3131: Use evaporation to concentrate material $3,856 $10,000 - - - $(-2,744.0)
-
MMBtu
$6,600
-
gal
- -
06 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $26,640 $13,000 - - - - $2,640
-
gal
- $24,000
07 4.621: Use fixtures to reduce machine changeout times $2,460 $1,390 - - - - - $1,440 $1,020
TOTAL RECOMMENDED $46,195 $47,605 $7,574
172,919
kWh
$1,324
-
kW-mo/yr
$1,868 $(-271.0)
-
MMBtu
$9,240
-
gal
$1,440 $25,020
TOTAL IMPLEMENTED $13,226 $22,676 $7,574
172,919
kWh
$1,324
-
kW-mo/yr
$1,868 - - $1,440 $1,020
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs