ITAC Assessment: SU0516
ITAC logo
ITAC Assessment: SU0516
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Electro-plating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 37
Plant Area 29,000
ft2
Annual Production 70,000
pieces
Production Hrs. Annual 6,205
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,066 1,016,853
kWh
Electricity Demand $16,970 1,340
kW-mo/yr
Electricity Fees $7,711 -
Natural Gas $23,227 4,677
MMBtu
Waste Disposal Costs
Water Usage $11,200 1,200
Tgal
TOTAL YEARLY COSTS $105,174
RECOMMENDED SAVINGS* $8,599 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,652

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $439 - $439
9,753
kWh
- - -
02 2.4322: Use or replace with energy efficient substitutes $1,098 $31 $819
18,200
kWh
$665
-
kW-mo/yr
$(-385.8)
-
MMBtu
-
03 2.7243: Improve air circulation with destratification fans / other methods $1,957 $290 $(-20.0)
(-445)
kWh
$(-16.3)
-
kW-mo/yr
$1,993
-
MMBtu
-
04 2.8121: Apply for tax-free status for energy purchases $858 $160 - - - $858
05 2.4221: Install compressor air intakes in coolest locations $541 $252 $541
12,032
kWh
- - -
06 2.2136: Install / repair insulation on steam lines $336 $194 - - $336
-
MMBtu
-
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $857 $696 - $857
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,406 $1,750 $1,406
31,247
kWh
- - -
09 2.7314: Reduce ventilation air $1,107 $2,030 $216
4,793
kWh
- $891
-
MMBtu
-
TOTAL RECOMMENDED $8,599 $5,403 $3,401
75,580
kWh
$1,505
-
kW-mo/yr
$2,835
-
MMBtu
$858
TOTAL IMPLEMENTED $6,652 $3,401 $1,454
32,301
kWh
$1,505
-
kW-mo/yr
$2,835
-
MMBtu
$858