| Assessment Year | 2000 |
|---|---|
| Principal Product | dry-type transformers |
| NAICS |
n/a
|
| SIC | 3612: Power, Distribution, and Specialty Transformers |
| Sales Range | $10 M to 50M |
| # of Employees | 252 |
| Plant Area |
150,000
ft2
|
| Annual Production | 62,000
pieces
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $70,448 | 2,252,052 |
kWh
|
$0.031 |
| Electricity Demand | $33,457 | 7,684 |
kW-mo/yr
|
$4.35 |
| Natural Gas | $124,433 | 25,526 |
MMBtu
|
$4.87 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $169,505 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $112,215 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.721: Initiate a program to acquire iso certification | $97,005 | $100,000 |
$6,470
184,349
kWh
|
- | - |
$535
-
lb
|
- | - | $90,000 | |
| 02 | 3.1161: Eliminate/reduce an operation | $35,890 | $108,460 | - | - |
$31,880
-
MMBtu
|
- |
$4,010
-
lb
|
- | - | |
| 03 | 2.3191: Use demand controller or load shedder | $8,180 | $18,900 | - |
$8,180
-
kW-mo/yr
|
- | - | - | - | - | |
| 04 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $7,245 | $5,625 | - | - | - |
$1,255
-
lb
|
- | $5,990 | - | |
| 05 | 2.2437: Recover waste heat from equipment | $6,460 | $19,500 |
$6,460
386,284
kWh
|
- | - | - | - | - | - | |
| 06 | 2.8113: Purchase gas directly from a contract gas supplier | $6,220 | - | - | - | - | - | - | $6,220 | - | |
| 07 | 3.8124: Install floating covers on tanks of volatile materials to reduce evaporation | $4,345 | $300 | - | - | - | - |
$4,345
-
lb
|
- | - | |
| 08 | 2.7131: Add area lighting switches | $3,620 | $6,160 |
$3,620
77,960
kWh
|
- | - | - | - | - | - | |
| 09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $540 | - |
$310
11,430
kWh
|
$230
-
kW-mo/yr
|
- | - | - | - | - | |
| TOTAL RECOMMENDED | $169,505 | $258,945 |
$16,860
660,023
kWh
|
$8,410
-
kW-mo/yr
|
$31,880
-
MMBtu
|
$1,790
-
lb
|
$8,355
-
lb
|
$12,210 | $90,000 | ||
| TOTAL IMPLEMENTED | $112,215 | $112,085 |
$10,090
262,309
kWh
|
- | - |
$1,790
-
lb
|
$4,345
-
lb
|
$5,990 | $90,000 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs