ITAC Assessment: AM0717
ITAC logo
ITAC Assessment: AM0717
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Livestock Feed
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 42
Plant Area 65,000
ft2
Annual Production 228,000
units
Production Hrs. Annual 6,712
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $223,238 3,495,566
kWh
Electricity Demand $33,782 9,632
kW-mo/yr
Electricity Fees $2,871 -
Natural Gas $47,746 10,066
MMBtu
TOTAL YEARLY COSTS $307,637
RECOMMENDED SAVINGS* $31,530 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,900

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $17,880 $4,000 - - $3,580 - - - $14,300
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,200 - $2,850
44,450
kWh
$350
-
kW-mo/yr
- - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,700 $1,000 $2,560
39,930
kWh
$140
-
kW-mo/yr
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,610 $4,060 $2,580
40,250
kWh
$140
-
kW-mo/yr
- - $160 $(-270.0) -
05 2.4239: Eliminate or reduce compressed air usage $2,060 $410 $2,060
32,240
kWh
- - - - - -
06 2.2135: Repair and eliminate steam leaks $1,650 $230 - - - $1,650
-
MMBtu
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $800 $10 $730
11,470
kWh
$70
-
kW-mo/yr
- - - - -
08 2.4314: Use synthetic lubricant $630 - $570
8,940
kWh
$60
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $31,530 $9,710 $11,350
177,280
kWh
$760
-
kW-mo/yr
$3,580 $1,650
-
MMBtu
$160 $(-270.0) $14,300
TOTAL IMPLEMENTED $30,900 $9,710 $10,780
168,340
kWh
$700
-
kW-mo/yr
$3,580 $1,650
-
MMBtu
$160 $(-270.0) $14,300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs