ITAC Assessment: UA0026
ITAC logo
ITAC Assessment: UA0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Bathtubs, Sinks
NAICS 326191: Plastics Plumbing Fixture Manufacturing
SIC 3088: Plastics Plumbing Fixtures
Sales Range less than $500
k
# of Employees 350
Plant Area 517,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,240
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $874,459 20,680,856
kWh
Electricity Demand $463,630 28,210
kW-mo/yr
Natural Gas $1,109,666 128,073
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $328,322 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,488

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $27,831 $950 - - $27,831
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $60,701 $170,829 $60,701
1,435,571
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,174 $58,587 $8,174
68,727
kWh
- -
04 2.2511: Insulate bare equipment $170,363 $32,592 - - $170,363
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $49,596 $18,202 - - $49,596
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,609 $4,200 $3,837
90,744
kWh
$1,772
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $6,048 - $3,709
87,729
kWh
$2,339
-
kW-mo/yr
-
TOTAL RECOMMENDED $328,322 $285,360 $76,421
1,682,771
kWh
$4,111
-
kW-mo/yr
$247,790
-
MMBtu
TOTAL IMPLEMENTED $39,488 $5,150 $7,546
178,473
kWh
$4,111
-
kW-mo/yr
$27,831
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs