| Assessment Year | 2008 |
|---|---|
| Principal Product | Bathtubs, Sinks |
| NAICS | 326191: Plastics Plumbing Fixture Manufacturing |
| SIC | 3088: Plastics Plumbing Fixtures |
| Sales Range | less than $500 k |
| # of Employees | 350 |
| Plant Area |
517,000
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $874,459 | 20,680,856 |
kWh
|
$0.042 |
| Electricity Demand | $463,630 | 28,210 |
kW-mo/yr
|
$16.43 |
| Natural Gas | $1,109,666 | 128,073 |
MMBtu
|
$8.66 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $328,322 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $39,488 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2135: Repair and eliminate steam leaks | $27,831 | $950 | - | - |
$27,831
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $60,701 | $170,829 |
$60,701
1,435,571
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,174 | $58,587 |
$8,174
68,727
kWh
|
- | - | |
| 04 | 2.2511: Insulate bare equipment | $170,363 | $32,592 | - | - |
$170,363
-
MMBtu
|
|
| 05 | 2.2136: Install / repair insulation on steam lines | $49,596 | $18,202 | - | - |
$49,596
-
MMBtu
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,609 | $4,200 |
$3,837
90,744
kWh
|
$1,772
-
kW-mo/yr
|
- | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,048 | - |
$3,709
87,729
kWh
|
$2,339
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $328,322 | $285,360 |
$76,421
1,682,771
kWh
|
$4,111
-
kW-mo/yr
|
$247,790
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $39,488 | $5,150 |
$7,546
178,473
kWh
|
$4,111
-
kW-mo/yr
|
$27,831
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs