Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

417

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other animal food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0500 #04 Y:2017 Reschedule plant operations or reduce load to avoid peaks $7,463 -
SF0500 #03 Y:2017 Reduce the pressure of compressed air to the minimum required $760 $2,070
SF0500 #02 Y:2017 Utilize higher efficiency lamps and/or ballasts $3,814 $7,558
SF0500 #01 Y:2017 Install / repair insulation on steam lines $161 $294
AM0727 #08 Y:2017 Install occupancy sensors $998 $1,980
AM0727 #07 Y:2017 Utilize higher efficiency lamps and/or ballasts $1,077 $1,960
AM0727 #06 Y:2017 Eliminate or reduce compressed air usage $1,352 $210
AM0727 #05 Y:2017 Use synthetic lubricant $1,746 -
AM0727 #04 Y:2017 Begin a practice of predictive / preventative maintenance $4,381 $4,370
AM0727 #03 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $6,179 $2,000
AM0727 #02 Y:2017 Replace boiler $6,260 $23,000
AM0727 #01 Y:2017 Utilize higher efficiency lamps and/or ballasts $5,881 $11,400
WM0099 #12 Y:2016 Insulate bare equipment $274 $315
WM0099 #11 Y:2016 Install compressor air intakes in coolest locations $344 -
WM0099 #10 Y:2016 Utilize energy-efficient belts and other improved mechanisms $358 $120
WM0099 #09 Y:2016 Insulate bare equipment $685 $481
WM0099 #08 Y:2016 Recover waste heat from equipment $733 $2,000
WM0099 #07 Y:2016 Eliminate or reduce compressed air usage $861 $900
WM0099 #06 Y:2016 Utilize controls to operate equipment only when needed $902 $2,200
WM0099 #05 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $1,368 $2,600