ITAC Assessment: AM0727
ITAC logo
ITAC Assessment: AM0727
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Animal Feed Products
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 47
Plant Area 65,000
ft2
Annual Production 110,000
ton
Production Hrs. Annual 6,384
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,734 3,143,127
kWh
Electricity Demand $62,499 9,915
kW-mo/yr
Electricity Fees $132 -
Natural Gas $53,042 9,331
MMBtu
TOTAL YEARLY COSTS $325,407
RECOMMENDED SAVINGS* $27,874 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,868

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,881 $11,400 $5,881
88,038
kWh
- - -
02 2.1224: Replace boiler $6,260 $23,000 - - $6,260
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,179 $2,000 $5,317
79,599
kWh
$862
-
kW-mo/yr
- -
04 4.611: Begin a practice of predictive / preventative maintenance $4,381 $4,370 $3,051
45,679
kWh
$990
-
kW-mo/yr
- $340
05 2.4314: Use synthetic lubricant $1,746 - $1,319
19,739
kWh
$427
-
kW-mo/yr
- -
06 2.4239: Eliminate or reduce compressed air usage $1,352 $210 $1,352
20,240
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,077 $1,960 $927
13,871
kWh
$150
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $998 $1,980 $998
14,943
kWh
- - -
TOTAL RECOMMENDED $27,874 $44,920 $18,845
282,109
kWh
$2,429
-
kW-mo/yr
$6,260
-
MMBtu
$340
TOTAL IMPLEMENTED $19,868 $21,920 $17,526
262,370
kWh
$2,002
-
kW-mo/yr
- $340
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs