ITAC Assessment: SF0500
ITAC logo
ITAC Assessment: SF0500
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product fish, reptile, bird pet food production and packaging
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 27,000
ft2
Annual Production 250,000
lb
Production Hrs. Annual 2,875
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,374 491,138
kWh
Electricity Demand $37,593 1,228
kW-mo/yr
Natural Gas $3,853 539
MMBtu
TOTAL YEARLY COSTS $96,820
RECOMMENDED SAVINGS* $96,929 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,882

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2136: Install / repair insulation on steam lines $161 $294 - - - $161
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,814 $7,558 $2,555
22,622
kWh
$1,321
-
kW-mo/yr
- - $61 $(-123.0)
03 2.4231: Reduce the pressure of compressed air to the minimum required $760 $2,070 $356
3,159
kWh
$404
-
kW-mo/yr
- - - -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,463 - - $7,463
-
kW-mo/yr
- - - -
05 2.8114: Change rate schedules or other changes in utility service $3,907 - - - $3,907 - - -
06 2.9114: Use solar heat to make electricty $80,824 $383,827 $45,691
412,892
kWh
$35,133
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $96,929 $393,749 $48,602
438,673
kWh
$44,321
-
kW-mo/yr
$3,907 $161
-
MMBtu
$61 $(-123.0)
TOTAL IMPLEMENTED $7,882 $7,852 $2,555
22,622
kWh
$1,321
-
kW-mo/yr
$3,907 $161
-
MMBtu
$61 $(-123.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs