ITAC Assessment: AM0456
ITAC logo
ITAC Assessment: AM0456
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Mushroom processing
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 550
Plant Area 275,000
ft2
Annual Production 31,200,000
lb
Production Hrs. Annual 3,640
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $955,118 26,355,866
kWh
Electricity Demand $362,541 46,638
kW-mo/yr
Natural Gas $421,606 131,215
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,420 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,920

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $16,000 $16,900 - - $16,000
-
MMBtu
02 2.2135: Repair and eliminate steam leaks $7,100 $500 - - $7,100
-
MMBtu
03 2.2113: Repair or replace steam traps $6,850 $400 - - $6,850
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $1,880 $1,010 $1,880
46,750
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,870 $400 $1,130
27,960
kWh
$740
-
kW-mo/yr
-
06 2.2135: Repair and eliminate steam leaks $1,100 $4,950 - - $1,100
-
MMBtu
07 2.4231: Reduce the pressure of compressed air to the minimum required $830 $15 $500
12,400
kWh
$330
-
kW-mo/yr
-
08 2.2511: Insulate bare equipment $790 $230 - - $790
-
MMBtu
TOTAL RECOMMENDED $36,420 $24,405 $3,510
87,110
kWh
$1,070
-
kW-mo/yr
$31,840
-
MMBtu
TOTAL IMPLEMENTED $32,920 $23,150 $1,130
27,960
kWh
$740
-
kW-mo/yr
$31,050
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs