Assessment Year | 1995 |
---|---|
Principal Product | Automotive rubber and weather stripping products |
NAICS |
n/a
|
SIC | 2822: Synthetic Rubber (Vulcanizable Elastomers) |
Sales Range | $10 M to 50M |
# of Employees | 450 |
Plant Area |
140,000
ft2
|
Annual Production | 7,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $941,776 | 19,023,740 |
kWh
|
$0.050 |
Natural Gas | $50,583 | 16,668 |
MMBtu
|
$3.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $112,493 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $53,983 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.7144: Install spectral reflectors / delamp | $31,839 | $70,726 |
$31,839
390,094
kWh
|
- | - | |
02 | 2.7241: Install outside air damper / economizer on hvac unit | $26,671 | $25,000 |
$26,671
798,652
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $5,121 | $2,948 |
$5,121
111,665
kWh
|
- | - | |
04 | 2.7241: Install outside air damper / economizer on hvac unit | $2,868 | $3,950 |
$2,868
85,873
kWh
|
- | - | |
05 | 2.7135: Install occupancy sensors | $1,266 | $528 |
$1,266
37,808
kWh
|
- | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $19,078 | $11,000 |
$25,931
529,308
kWh
|
$(-6,853.0)
-
MMBtu
|
- | |
07 | 3.1192: Reduce scrap production | $25,650 | - | - | - |
$25,650
-
lb
|
|
TOTAL RECOMMENDED | $112,493 | $114,152 |
$93,696
1,953,400
kWh
|
$(-6,853.0)
-
MMBtu
|
$25,650
-
lb
|
||
TOTAL IMPLEMENTED | $53,983 | $18,426 |
$35,186
764,654
kWh
|
$(-6,853.0)
-
MMBtu
|
$25,650
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs