417
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Other animal food manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| AM0740 #01 Y:2017 | 01 | 2017 | Analyze flue gas for proper air/fuel ratio | $24,310 | $1,320 | |
| GT0907 #04 Y:2017 | 04 | 2017 | Insulate glazing, walls, ceilings, and roofs | $519 | $3,858 | |
| GT0907 #03 Y:2017 | 03 | 2017 | Use solar heat to make electricty | $15,841 | $80,789 | |
| GT0907 #02 Y:2017 | 02 | 2017 | Utilize higher efficiency lamps and/or ballasts | $7,145 | $9,268 | |
| GT0907 #01 Y:2017 | 01 | 2017 | Lower temperature during the winter season and vice-versa | $369 | $120 | |
| NL0013 #07 Y:2017 | 07 | 2017 | Eliminate leaks in inert gas and compressed air lines/ valves | $133 | $110 | |
| NL0013 #06 Y:2017 | 06 | 2017 | Utilize energy-efficient belts and other improved mechanisms | $309 | $111 | |
| NL0013 #05 Y:2017 | 05 | 2017 | Install / repair insulation on steam lines | $485 | $273 | |
| NL0013 #04 Y:2017 | 04 | 2017 | Reduce the pressure of compressed air to the minimum required | $668 | - | |
| NL0013 #03 Y:2017 | 03 | 2017 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,676 | $452 | |
| NL0013 #02 Y:2017 | 02 | 2017 | Insulate bare equipment | $6,000 | $16,000 | |
| NL0013 #01 Y:2017 | 01 | 2017 | Recover and reuse waste material | $6,493 | $7,000 | |
| UF0507 #06 Y:2017 | 06 | 2017 | Install adequate dryers on air lines to eliminate blowdown | $3,808 | - | |
| UF0507 #05 Y:2017 | 05 | 2017 | Install an uninteruptable power supply | $14,679 | $43,710 | |
| UF0507 #04 Y:2017 | 04 | 2017 | Increase amount of condensate returned | $814 | $876 | |
| UF0507 #03 Y:2017 | 03 | 2017 | Install compressor air intakes in coolest locations | $2,363 | $210 | |
| UF0507 #02 Y:2017 | 02 | 2017 | Install / repair insulation on steam lines | $2,643 | $3,762 | |
| UF0507 #01 Y:2017 | 01 | 2017 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,676 | $1,124 | |
| SF0500 #06 Y:2017 | 06 | 2017 | Use solar heat to make electricty | $80,824 | $383,827 | |
| SF0500 #05 Y:2017 | 05 | 2017 | Change rate schedules or other changes in utility service | $3,907 | - |