ITAC Assessment: GT0907
ITAC logo
ITAC Assessment: GT0907
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Dog Treats
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $1
M
to 5
M
# of Employees 27
Plant Area 18,450
ft2
Annual Production 290,000
lb
Production Hrs. Annual 5,225
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,006 694,560
kWh
Natural Gas $37,117 3,987
MMBtu
Waste Disposal Costs
Water Usage $12,548 606
Tgal
TOTAL YEARLY COSTS $125,671
RECOMMENDED SAVINGS* $23,874 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7221: Lower temperature during the winter season and vice-versa $369 $120 $369
3,383
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,145 $9,268 $7,145
65,546
kWh
03 2.9114: Use solar heat to make electricty $15,841 $80,789 $15,841
144,756
kWh
04 2.7491: Insulate glazing, walls, ceilings, and roofs $519 $3,858 $519
4,756
kWh
TOTAL RECOMMENDED $23,874 $94,035 $23,874
218,441
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs