ITAC Assessment: NL0013
ITAC logo
ITAC Assessment: NL0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Mineral and Supplemental Cattle Feed
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 44
Plant Area 50,000
ft2
Annual Production 83,587
ton
Production Hrs. Annual 8,760
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,706 2,671,682
kWh
Electricity Demand $81,537 7,758
kW-mo/yr
Electricity Fees $12,444 -
Natural Gas $437,168 58,289
MMBtu
Waste Disposal Costs
Water Usage $26,211 32,641
Tgal
Solid Waste (non-haz) $28,350 94,500
lb
TOTAL YEARLY COSTS $713,416
RECOMMENDED SAVINGS* $15,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,676

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 3.5311: Recover and reuse waste material $6,493 $7,000 - - $193 $6,300
02 2.2511: Insulate bare equipment $6,000 $16,000 - $6,000
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,676 $452 $1,676
35,055
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $668 - $668
13,974
kWh
- - -
05 2.2136: Install / repair insulation on steam lines $485 $273 - $485
-
MMBtu
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $309 $111 $309
6,480
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $133 $110 $133
2,775
kWh
- - -
TOTAL RECOMMENDED $15,764 $23,946 $2,786
58,284
kWh
$6,485
-
MMBtu
$193 $6,300
TOTAL IMPLEMENTED $7,676 $16,452 $1,676
35,055
kWh
$6,000
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs