Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

417

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other animal food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0384 #04 Y:2008 Insulate bare equipment $2,032 $577
WV0384 #03 Y:2008 Recover waste heat from equipment $3,084 $1,070
WV0384 #02 Y:2008 Develop a repair/replace policy $10,724 $1,094
WV0384 #01 Y:2008 Utilize energy-efficient belts and other improved mechanisms $13,545 $1,000
UD0780 #13 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $5,234 $1,000
UD0780 #12 Y:2008 Increase amount of condensate returned $2,587 $950
UD0780 #11 Y:2008 Reduce the pressure of compressed air to the minimum required $2,749 $1,500
UD0780 #10 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $3,382 $12,224
UD0780 #09 Y:2008 Repair and eliminate steam leaks $4,058 $700
UD0780 #08 Y:2008 Utilize higher efficiency lamps and/or ballasts $5,293 $10,770
UD0780 #07 Y:2008 Analyze flue gas for proper air/fuel ratio $5,689 -
UD0780 #06 Y:2008 Use closed cycle process to minimize waste water production $6,428 $4,000
UD0780 #05 Y:2008 Use waste heat from hot flue gases to preheat $12,375 $30,000
UD0780 #04 Y:2008 Increase amount of condensate returned $12,693 $7,000
UD0780 #03 Y:2008 Enhance sensitivity of temperature control and cutoff $14,100 $18,000
UD0780 #02 Y:2008 Flash condensate to produce lower pressure steam $28,671 $23,190
UD0780 #01 Y:2008 Insulate bare equipment $31,350 $8,290
AM0539 #06 Y:2007 Utilize higher efficiency lamps and/or ballasts $1,830 $605
AM0539 #05 Y:2007 Optimize plant power factor $4,100 $15,230
AM0539 #04 Y:2007 Utilize higher efficiency lamps and/or ballasts $6,140 $570