417
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Other animal food manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0384 #04 Y:2008 | 04 | 2008 | Insulate bare equipment | $2,032 | $577 | |
| WV0384 #03 Y:2008 | 03 | 2008 | Recover waste heat from equipment | $3,084 | $1,070 | |
| WV0384 #02 Y:2008 | 02 | 2008 | Develop a repair/replace policy | $10,724 | $1,094 | |
| WV0384 #01 Y:2008 | 01 | 2008 | Utilize energy-efficient belts and other improved mechanisms | $13,545 | $1,000 | |
| UD0780 #13 Y:2008 | 13 | 2008 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,234 | $1,000 | |
| UD0780 #12 Y:2008 | 12 | 2008 | Increase amount of condensate returned | $2,587 | $950 | |
| UD0780 #11 Y:2008 | 11 | 2008 | Reduce the pressure of compressed air to the minimum required | $2,749 | $1,500 | |
| UD0780 #10 Y:2008 | 10 | 2008 | Use adjustable frequency drive or multiple speed motors on existing system | $3,382 | $12,224 | |
| UD0780 #09 Y:2008 | 09 | 2008 | Repair and eliminate steam leaks | $4,058 | $700 | |
| UD0780 #08 Y:2008 | 08 | 2008 | Utilize higher efficiency lamps and/or ballasts | $5,293 | $10,770 | |
| UD0780 #07 Y:2008 | 07 | 2008 | Analyze flue gas for proper air/fuel ratio | $5,689 | - | |
| UD0780 #06 Y:2008 | 06 | 2008 | Use closed cycle process to minimize waste water production | $6,428 | $4,000 | |
| UD0780 #05 Y:2008 | 05 | 2008 | Use waste heat from hot flue gases to preheat | $12,375 | $30,000 | |
| UD0780 #04 Y:2008 | 04 | 2008 | Increase amount of condensate returned | $12,693 | $7,000 | |
| UD0780 #03 Y:2008 | 03 | 2008 | Enhance sensitivity of temperature control and cutoff | $14,100 | $18,000 | |
| UD0780 #02 Y:2008 | 02 | 2008 | Flash condensate to produce lower pressure steam | $28,671 | $23,190 | |
| UD0780 #01 Y:2008 | 01 | 2008 | Insulate bare equipment | $31,350 | $8,290 | |
| AM0539 #06 Y:2007 | 06 | 2007 | Utilize higher efficiency lamps and/or ballasts | $1,830 | $605 | |
| AM0539 #05 Y:2007 | 05 | 2007 | Optimize plant power factor | $4,100 | $15,230 | |
| AM0539 #04 Y:2007 | 04 | 2007 | Utilize higher efficiency lamps and/or ballasts | $6,140 | $570 |