Assessment Year | 2008 |
---|---|
Principal Product | Poultry Feed |
NAICS | 311119: Other Animal Food Manufacturing |
SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
Sales Range | $50 M to 100M |
# of Employees | 36 |
Plant Area |
22,000
ft2
|
Annual Production | 416,000
ton
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $452,545 | 11,126,556 |
kWh
|
$0.041 |
Electricity Demand | $160,379 | 25,212 |
kW-mo/yr
|
$6.36 |
Electricity Fees | $1,044 | - |
|
- |
Natural Gas | $523,823 | 51,814 |
MMBtu
|
$10.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,252 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,919 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $13,545 | $1,000 |
$11,259
276,834
kWh
|
$3,078
-
kW-mo/yr
|
- | $(-792.0) | - | |
02 | 2.4151: Develop a repair/replace policy | $10,724 | $1,094 |
$8,530
209,730
kWh
|
$2,344
-
kW-mo/yr
|
- | $(-150.0) | - | |
03 | 2.2437: Recover waste heat from equipment | $3,084 | $1,070 | - | - |
$3,084
-
MMBtu
|
- | - | |
04 | 2.2511: Insulate bare equipment | $2,032 | $577 | - | - |
$2,032
-
MMBtu
|
- | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,872 | $2,000 | - | - |
$2,022
-
MMBtu
|
$(-150.0) | - | |
06 | 2.3212: Optimize plant power factor | $1,800 | $11,500 | - | - | - | - | $1,800 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,609 | $6,026 |
$960
33,634
kWh
|
$649
-
kW-mo/yr
|
- | - | - | |
08 | 2.4239: Eliminate or reduce compressed air usage | $870 | $308 |
$387
9,527
kWh
|
$483
-
kW-mo/yr
|
- | - | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $364 | $438 |
$286
7,028
kWh
|
$78
-
kW-mo/yr
|
- | - | - | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $352 | $25 |
$276
6,796
kWh
|
$76
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $36,252 | $24,038 |
$21,698
543,549
kWh
|
$6,708
-
kW-mo/yr
|
$7,138
-
MMBtu
|
$(-1,092.0) | $1,800 | ||
TOTAL IMPLEMENTED | $13,919 | $7,891 |
$10,439
266,715
kWh
|
$3,630
-
kW-mo/yr
|
- | $(-150.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs