ITAC Assessment: CO0140
ITAC logo
ITAC Assessment: CO0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product SILVER & ZINC BATTERIES
NAICS
n/a
SIC 3692: Primary Batteries, Dry and Wet
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 7,000
pieces
Production Hrs. Annual 2,730
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,457 1,317,702
kWh
Natural Gas $16,264 4,041
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,674 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,190

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $837 $1,350 - $837
-
MMBtu
-
02 2.1123: Install automatic stack damper $906 $1,100 - $906
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $230 $100 $230
4,103
kWh
- -
04 2.2514: Cover open tanks $484 $200 $484
8,499
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $646 $650 $646
11,430
kWh
- -
06 3.4115: Recover and reuse cooling water $6,385 $8,000 $85
1,465
kWh
- $6,300
07 2.7142: Utilize higher efficiency lamps and/or ballasts $186 $218 $186
3,224
kWh
- -
TOTAL RECOMMENDED $9,674 $11,618 $1,631
28,721
kWh
$1,743
-
MMBtu
$6,300
TOTAL IMPLEMENTED $9,190 $11,418 $1,147
20,222
kWh
$1,743
-
MMBtu
$6,300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs