559
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| GT0907 #01 Y:2017 | 01 | 2017 | Lower temperature during the winter season and vice-versa | $369 | $120 | |
| NL0013 #07 Y:2017 | 07 | 2017 | Eliminate leaks in inert gas and compressed air lines/ valves | $133 | $110 | |
| NL0013 #06 Y:2017 | 06 | 2017 | Utilize energy-efficient belts and other improved mechanisms | $309 | $111 | |
| NL0013 #05 Y:2017 | 05 | 2017 | Install / repair insulation on steam lines | $485 | $273 | |
| NL0013 #04 Y:2017 | 04 | 2017 | Reduce the pressure of compressed air to the minimum required | $668 | - | |
| NL0013 #03 Y:2017 | 03 | 2017 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,676 | $452 | |
| NL0013 #02 Y:2017 | 02 | 2017 | Insulate bare equipment | $6,000 | $16,000 | |
| NL0013 #01 Y:2017 | 01 | 2017 | Recover and reuse waste material | $6,493 | $7,000 | |
| WV0549 #17 Y:2017 | 17 | 2017 | Utilize higher efficiency lamps and/or ballasts | $286 | $1,075 | |
| WV0549 #16 Y:2017 | 16 | 2017 | Reduce the pressure of compressed air to the minimum required | $308 | $20 | |
| WV0549 #15 Y:2017 | 15 | 2017 | Upgrade controls on compressors | $527 | $2,000 | |
| WV0549 #14 Y:2017 | 14 | 2017 | Develop a repair/replace policy | $1,016 | $582 | |
| WV0549 #13 Y:2017 | 13 | 2017 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,249 | $75 | |
| WV0549 #12 Y:2017 | 12 | 2017 | Minimize water usage | $1,517 | $1,050 | |
| WV0549 #11 Y:2017 | 11 | 2017 | Install steam trap | $1,534 | $1,380 | |
| WV0549 #10 Y:2017 | 10 | 2017 | Analyze flue gas for proper air/fuel ratio | $1,680 | $500 | |
| WV0549 #09 Y:2017 | 09 | 2017 | Utilize energy-efficient belts and other improved mechanisms | $1,755 | - | |
| WV0549 #08 Y:2017 | 08 | 2017 | Use waste heat from hot flue gases to preheat | $2,180 | $4,272 | |
| WV0549 #07 Y:2017 | 07 | 2017 | Insulate bare equipment | $2,345 | $6,890 | |
| WV0549 #06 Y:2017 | 06 | 2017 | Replace electric motors with back pressure steam turbines and use exhaust steam for process heat | $2,823 | $11,000 |