Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

559

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Animal food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0458 #02 Y:2018 Burn a less expensive grade of fuel $213,044 $120,000
SU0458 #01 Y:2018 Reduce the pressure of compressed air to the minimum required $244 -
UK1715 #08 Y:2017 Eliminate or reduce compressed air usage $124 $453
UK1715 #07 Y:2017 Reduce the pressure of compressed air to the minimum required $337 -
UK1715 #06 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $562 $2,190
UK1715 #05 Y:2017 Eliminate or reduce compressed air usage $1,912 $3,230
UK1715 #04 Y:2017 Use only certified motor repair shops $11,102 $44,454
UK1715 #03 Y:2017 Turn off equipment when not in use $11,357 $10,880
UK1715 #02 Y:2017 Install occupancy sensors $1,250 $1,858
UK1715 #01 Y:2017 Utilize higher efficiency lamps and/or ballasts $8,374 $9,518
AM0740 #07 Y:2017 Reduce the pressure of compressed air to the minimum required $1,430 $10
AM0740 #06 Y:2017 Use synthetic lubricant $1,465 -
AM0740 #05 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $2,500 $1,000
AM0740 #04 Y:2017 Utilize higher efficiency lamps and/or ballasts $2,570 $4,160
AM0740 #03 Y:2017 Utilize energy-efficient belts and other improved mechanisms $5,630 -
AM0740 #02 Y:2017 Optimize plant power factor $15,720 $23,900
AM0740 #01 Y:2017 Analyze flue gas for proper air/fuel ratio $24,310 $1,320
GT0907 #04 Y:2017 Insulate glazing, walls, ceilings, and roofs $519 $3,858
GT0907 #03 Y:2017 Use solar heat to make electricty $15,841 $80,789
GT0907 #02 Y:2017 Utilize higher efficiency lamps and/or ballasts $7,145 $9,268