ITAC Assessment: SU0458
ITAC logo
ITAC Assessment: SU0458
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Dry Dog and Cat Food
NAICS 311111: Dog and Cat Food Manufacturing
SIC 2047: Dog and Cat Food
Sales Range $10
M
to 50
M
# of Employees 74
Plant Area 50,972
ft2
Annual Production 41,643,731
lb
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,778 3,034,700
kWh
Electricity Demand $60,796 9,983
kW-mo/yr
Electricity Fees $721 -
LPG $266,498 24,957
MMBtu
Fuel Oil #2 $305,714 18,844
MMBtu
Waste Disposal Costs
Water Usage $18,095 3,150
Tgal
TOTAL YEARLY COSTS $711,602
RECOMMENDED SAVINGS* $315,649 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $315,010

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $244 - $244
12,217
kWh
- - - -
02 2.1331: Burn a less expensive grade of fuel $213,044 $120,000 - - - - $213,044
03 2.7224: Reduce space conditioning during non-working hours $206 $168 $32
1,598
kWh
- $174
-
MMBtu
- -
04 2.1224: Replace boiler $101,732 $175,000 - - $101,732
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $104 $146 $28
1,402
kWh
$12
-
kW-mo/yr
- $28 $36
06 2.7142: Utilize higher efficiency lamps and/or ballasts $130 $258 $77
3,864
kWh
$58
-
kW-mo/yr
- $11 $(-16.0)
07 2.7135: Install occupancy sensors $189 $580 $189
9,434
kWh
- - - -
TOTAL RECOMMENDED $315,649 $296,152 $570
28,515
kWh
$70
-
kW-mo/yr
$101,906
-
MMBtu
$39 $213,064
TOTAL IMPLEMENTED $315,010 $295,404 $105
5,266
kWh
$70
-
kW-mo/yr
$101,732
-
MMBtu
$39 $213,064
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs