Assessment Year | 2018 |
---|---|
Principal Product | Dry Dog and Cat Food |
NAICS | 311111: Dog and Cat Food Manufacturing |
SIC | 2047: Dog and Cat Food |
Sales Range | $10 M to 50M |
# of Employees | 74 |
Plant Area |
50,972
ft2
|
Annual Production | 41,643,731
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $59,778 | 3,034,700 |
kWh
|
$0.020 | |
Electricity Demand | $60,796 | 9,983 |
kW-mo/yr
|
$6.09 | |
Electricity Fees | $721 | - |
|
- | |
LPG | $266,498 | 24,957 |
MMBtu
|
$10.68 | |
Fuel Oil #2 | $305,714 | 18,844 |
MMBtu
|
$16.22 | |
Waste Disposal Costs | |||||
Water Usage | $18,095 | 3,150 |
Tgal
|
$5.74 | |
TOTAL YEARLY COSTS | $711,602 | ||||
RECOMMENDED SAVINGS* | $315,649 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $315,010 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $244 | - |
$244
12,217
kWh
|
- | - | - | - | |
02 | 2.1331: Burn a less expensive grade of fuel | $213,044 | $120,000 | - | - | - | - | $213,044 | |
03 | 2.7224: Reduce space conditioning during non-working hours | $206 | $168 |
$32
1,598
kWh
|
- |
$174
-
MMBtu
|
- | - | |
04 | 2.1224: Replace boiler | $101,732 | $175,000 | - | - |
$101,732
-
MMBtu
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $104 | $146 |
$28
1,402
kWh
|
$12
-
kW-mo/yr
|
- | $28 | $36 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $130 | $258 |
$77
3,864
kWh
|
$58
-
kW-mo/yr
|
- | $11 | $(-16.0) | |
07 | 2.7135: Install occupancy sensors | $189 | $580 |
$189
9,434
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $315,649 | $296,152 |
$570
28,515
kWh
|
$70
-
kW-mo/yr
|
$101,906
-
MMBtu
|
$39 | $213,064 | ||
TOTAL IMPLEMENTED | $315,010 | $295,404 |
$105
5,266
kWh
|
$70
-
kW-mo/yr
|
$101,732
-
MMBtu
|
$39 | $213,064 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs