Assessment Year | 2018 |
---|---|
Principal Product | Farm Animal Feed |
NAICS | 311119: Other Animal Food Manufacturing |
SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
120,000
ft2
|
Annual Production | 2,000,000
units
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $63,352 | 896,033 |
kWh
|
$0.071 |
Electricity Demand | $43,444 | 5,838 |
kW-mo/yr
|
$7.44 |
Electricity Fees | $9,417 | - |
|
- |
TOTAL YEARLY COSTS | $116,213 | |||
RECOMMENDED SAVINGS* | $35,018 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,374 | $9,518 |
$6,633
93,425
kWh
|
$1,741
-
kW-mo/yr
|
|
02 | 2.7135: Install occupancy sensors | $1,250 | $1,858 |
$1,250
17,601
kWh
|
- | |
03 | 2.6218: Turn off equipment when not in use | $11,357 | $10,880 |
$11,357
159,965
kWh
|
- | |
04 | 2.4152: Use only certified motor repair shops | $11,102 | $44,454 |
$6,816
96,000
kWh
|
$4,286
-
kW-mo/yr
|
|
05 | 2.4239: Eliminate or reduce compressed air usage | $1,912 | $3,230 |
$1,912
26,930
kWh
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $562 | $2,190 |
$562
7,910
kWh
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $337 | - |
$337
4,746
kWh
|
- | |
08 | 2.4239: Eliminate or reduce compressed air usage | $124 | $453 |
$124
1,745
kWh
|
- | |
TOTAL RECOMMENDED | $35,018 | $72,583 |
$28,991
408,322
kWh
|
$6,027
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs