Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

545

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Animal food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0560 #01 Y:2021 Use solar heat to make electricty $41,999 $359,360
OK1021 #05 Y:2019 Install sub-metering equipment $5,665 $887
OK1021 #04 Y:2019 Install / repair insulation on steam lines $6,865 $426
OK1021 #03 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $1,570 $850
OK1021 #02 Y:2019 Utilize higher efficiency lamps and/or ballasts $2,490 $4,312
OK1021 #01 Y:2019 Clean and maintain refrigerant condensers and towers $957 $524
NL0021 #03 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $335 $1,000
NL0021 #02 Y:2018 Utilize higher efficiency lamps and/or ballasts $1,774 $15,206
NL0021 #01 Y:2018 Reschedule plant operations or reduce load to avoid peaks $12,355 -
AM0753 #12 Y:2018 Utilize higher efficiency lamps and/or ballasts $635 $258
AM0753 #11 Y:2018 Eliminate or reduce compressed air usage $871 $829
AM0753 #10 Y:2018 Pay utility bills on time $1,108 -
AM0753 #09 Y:2018 Reduce the pressure of compressed air to the minimum required $1,326 $8
AM0753 #08 Y:2018 Install occupancy sensors $1,662 $1,732
AM0753 #07 Y:2018 Utilize higher efficiency lamps and/or ballasts $2,377 $5,228
AM0753 #06 Y:2018 Utilize energy-efficient belts and other improved mechanisms $4,750 -
AM0753 #05 Y:2018 Optimize plant power factor $5,666 $14,090
AM0753 #04 Y:2018 Meter waste water $6,905 $2,650
AM0753 #03 Y:2018 Use demand controller or load shedder $17,100 -
AM0753 #02 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $28,122 $4,000