Assessment Year | 2021 |
---|---|
Principal Product | Equine Feed |
NAICS | 311119: Other Animal Food Manufacturing |
SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
390,000
ft2
|
Annual Production | 26,000
ton
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $93,001 | 1,335,331 |
kWh
|
$0.070 | |
Electricity Demand | $49,615 | 6,741 |
kW-mo/yr
|
$7.36 | |
Electricity Fees | $21,896 | - |
|
- | |
Natural Gas | $16,764 | 4,698 |
MMBtu
|
$3.57 | |
Waste Disposal Costs | |||||
Water Usage | $2,337 | 714 |
Tgal
|
$3.27 | |
Water Disposal | $7,333 | 714 |
Tgal
|
$10.27 | |
TOTAL YEARLY COSTS | $190,946 | ||||
RECOMMENDED SAVINGS* | $199,673 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $19,987 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $41,999 | $359,360 |
$41,999
599,987
kWh
|
- | - | - | |
02 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $4,454 | $5,998 |
$4,454
63,630
kWh
|
- | - | - | |
03 | 2.7135: Install occupancy sensors | $3,072 | $8,274 |
$3,072
43,879
kWh
|
- | - | - | |
04 | 2.2136: Install / repair insulation on steam lines | $2,897 | $1,544 | - |
$2,897
-
MMBtu
|
- | - | |
05 | 2.2122: Install / repair insulation on condensate lines | $1,841 | $378 | - |
$1,841
-
MMBtu
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,156 | $306 |
$1,156
16,514
kWh
|
- | - | - | |
07 | 4.664: Level three - install or modify control system with communication and nonlocal external information (i.e. weather foreca | $134,615 | $11,004 | - | - | - | $134,615 | |
08 | 4.463: Modify facility to avoid excess maintenance costs | $9,639 | $725 | - | - | $9,639 | - | |
TOTAL RECOMMENDED | $199,673 | $387,589 |
$50,681
724,010
kWh
|
$4,738
-
MMBtu
|
$9,639 | $134,615 | ||
TOTAL IMPLEMENTED | $19,987 | $8,951 |
$5,610
80,144
kWh
|
$4,738
-
MMBtu
|
$9,639 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs