ITAC Assessment: UF0560
ITAC logo
ITAC Assessment: UF0560
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Equine Feed
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 390,000
ft2
Annual Production 26,000
ton
Production Hrs. Annual 2,080
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,001 1,335,331
kWh
Electricity Demand $49,615 6,741
kW-mo/yr
Electricity Fees $21,896 -
Natural Gas $16,764 4,698
MMBtu
Waste Disposal Costs
Water Usage $2,337 714
Tgal
Water Disposal $7,333 714
Tgal
TOTAL YEARLY COSTS $190,946
RECOMMENDED SAVINGS* $199,673 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,987

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $41,999 $359,360 $41,999
599,987
kWh
- - -
02 2.4222: Install adequate dryers on air lines to eliminate blowdown $4,454 $5,998 $4,454
63,630
kWh
- - -
03 2.7135: Install occupancy sensors $3,072 $8,274 $3,072
43,879
kWh
- - -
04 2.2136: Install / repair insulation on steam lines $2,897 $1,544 - $2,897
-
MMBtu
- -
05 2.2122: Install / repair insulation on condensate lines $1,841 $378 - $1,841
-
MMBtu
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,156 $306 $1,156
16,514
kWh
- - -
07 4.664: Level three - install or modify control system with communication and nonlocal external information (i.e. weather foreca $134,615 $11,004 - - - $134,615
08 4.463: Modify facility to avoid excess maintenance costs $9,639 $725 - - $9,639 -
TOTAL RECOMMENDED $199,673 $387,589 $50,681
724,010
kWh
$4,738
-
MMBtu
$9,639 $134,615
TOTAL IMPLEMENTED $19,987 $8,951 $5,610
80,144
kWh
$4,738
-
MMBtu
$9,639 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs